What you get
A lift is only as good as its installation. Our engineers survey the shaft, confirm the design against your building, install to the manufacturer's method and test every safety device before we hand the lift over to you.
- One point of responsibility from survey to handover
- Installation planned around your construction schedule
- Every safety device tested before the lift is released for use
- A maintenance plan ready on day one
How it works
Site survey
We measure the shaft, pit and headroom, check the machine-room or MRL requirement and note anything that affects the design.
Design and approval
You receive a layout drawing with cabin size, door type, loads on the structure and civil requirements for your architect.
Installation
Guide rails, machine, cabin, doors and wiring are installed and aligned by trained technicians in a planned sequence.
Testing and handover
Safety gear, governor, door interlocks and levelling are tested. You receive operating instructions and the service schedule.